It may be convenient to use the UPS as a master on/off switch for the protected equipment. Press and release the button again to turn off power to the loads. The loads are immediately powered while the UPS performs a self-test. Connect to Utility Operating Instructions Switch On - Switch Off With the UPS plugged in, press and release the on/off/test button to supply power to the loads. Warning: Changes or modifications to this unit not expressly approved by the party responsible for compliance could void the warranty. Do not operate the UPS where the temperature and humidity is outside the specified limits. Placement Install the UPS in a protected area that is free of excessive dust and has adequate air flow. The packaging is recyclable save it for reuse or dispose of it properly. Notify the carrier and dealer if there is damage. Installation and Initial Start-Up To obtain warranty coverage, please fill out and return the warranty registration card now.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |